Project number: PN301171-02
Project name: Line 2 FT extension T04S65
Customer: BMW Group, Dingolfing, Plant 2.20
This area is only accessible via the direct link, the page
is not indexed by search engines!
Version history
05.02.2024 V1.0:
Basic version
08.02.2024 V1.1:
Revised version after occupational safety meeting on 06.02.2024, the following points have been changed:
- Enclosure for cylinders with guide rods at the lowering station; lifting stations do not have this enclosure as there are no movable guide rods
- Entry/exit tunnels between the upper and lower levels with additional protection to reduce the access height to 47 cm
- Missing double handrails corrected
- Additional protective wall to prevent the belts from engaging at the end of section B of the lifting head (lowering station at transition)
- Additional contour plate + tunnel to prevent intervention in lifter at the end of section B (lowering station at transition)
- 6x belt rupture switches integrated on the lifting head
Layout version 08.02.2024 V1.1, Download EASM:
Free Download Viewer:
Layout version 08.02.2024 V1.1, Download 3D-PDF:
(Open with Adobe Acrobat Reader)
Layout version 05.02.2024 V1.0, Download EASM:
Free Download Viewer:
Layout version 05.02.2024 V1.0, Download 3D-PDF:
(Open with Adobe Acrobat Reader)